Strategic Fund / Sinking Fund Projects

District Strategic Plan

2018-2023

Strategic Plan Page 1

Strategic Plan Page 2

 

Project Description

Approximate Cost

Pictures

SHS roofs replaced with Duralast

2012 - Commons area - $30,932

2013 - Band room, boys locker room, south bump out - $21,904

2014 - 2nd Floor roof - $62,600

2015 - MPR roof - $30,641

$146,078

PDF DocumentRoof 1

PDF DocumentRoof 2

PDF DocumentRoof 3

SHS floor replacement 

$57,573

PDF DocumentSHS tile floor replacement

SHS blacktop repair

$2,169

PDF DocumentBlacktop repair

SHS office carpet replacement

$7,660

PDF DocumentOffice carpet

SHS water main repair

 

PDF DocumentWater Main Repair

SHS updated metal shop electrical

$8,700

PDF DocumentElectrical panel

Replaced pole vault pit

 

PDF DocumentPole Vault

SES parking lot repair/reseal/repaint

$3,750

PDF DocumentSES parking lot

SES sidewalk tear out and replace

$4,297

PDF Documentsidewalk repair

SHS drywall repair around skylight

$879

PDF Documentskylight drywall repair

SES plumbing and toilet repaired and updated

$5,447

PDF DocumentToilet - plumbing repair

Security System

$147,615

 

Veritcal blinds replacement

$8,364

 

Computer labs electrical updates

$2,647

 

Door replacement

$16,589

 

Track - resurfaced and repaired

$45,186