Sinking Fund Projects
Project Description Approximate Cost Pictures

SHS roofs replaced with duralast

2012 - Commons area - $30,932

2013 - Band room, boys locker room, south bump out - $21,904

2014 - 2nd Floor roof - $62,600

2015 - MPR roof - $30,641

$146,078

PDF DocumentRoof 1

PDF DocumentRoof 2

PDF DocumentRoof 3

SHS floor replacement  $57,573 PDF DocumentSHS tile floor replacement
SHS blacktop repair $2,169 PDF DocumentBlacktop repair
SHS office carpet replacement $7,660 PDF DocumentOffice carpet
SHS water main repair   PDF DocumentWater Main Repair
SHS updated metal shop electrical $8,700 PDF DocumentElectrical panel
Replaced pole vault pit   PDF DocumentPole Vault
SES parking lot repair/reseal/repaint $3,750 PDF DocumentSES parking lot
SES sidewalk tear out and replace $4,297 PDF Documentsidewalk repair
SHS drywall repair around skylight $879 PDF Documentskylight drywall repair
SES plumbing and toilet repaired and updated $5,447 PDF DocumentToilet - plumbing repair
Security System

$147,615

 
Veritcal blinds replacement

$8,364

 
Computer labs electrical updates $2,647  
Door replacement $16,589  
Track - resurfaced and repaired $45,186